Customization: | Available |
---|---|
Breaking Capacity: | High Voltage Circuit Breakers |
Operation: | Manual Type |
Still deciding? Get samples of US$ 3000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
NO. | Item | Unit | Data | |
1 | Rated Voltage | KV | 12 | |
2 | Rated Frequency | HZ | 50 | |
3 | Rated Current | A | 630 | 1250 |
4 | Rated Short-Circuit Breaking Current | KA | 20 | 25 |
5 | Rated Peak Withstand Current (Peak) | KA | 50 | 63 |
6 | Rated Short-Time Withstand Current | KA | 20 | 25 |
7 | Rated Short-Circuit Closing Current (Peak) | KA | 50 | 63 |
8 | Mechanical Life | Times | 10000 | |
9 | Rated Short-Circuit Breaking Current Breaking Times | Times | 30 | |
10 | Power Frequency Withstand Voltage (1min): Wet/Dry, Phase-to-PhasePhase-to-Ground |
KV | 30/42/48 | |
11 | Lightning Impulse Withstand Voltage (Peak): Phase-to-PhasePhase-to-Ground |
KV | 75/85 | |
12 | Secondary Circuit 1 min Power Frequency Withstand Voltage | KV | 2 |
1. How to buy your ideal products?
A: You can provide us with your drawings, and we will produce it as per your drawings. Or we can design it if you do not have a clear plan.
2. How to pay?
A: TT and L/C are acceptable and TT will be more appreciated.30% deposit before production, 70% balance before loading by TT.
3. What is the delivery time?
A: It depends on order quantity. Generally, the delivery time will be within 15 to 30 days.
4. Package information
A:For inner box and master carton are made as per international standards, and we can make special designs for you if needed. If necessary, will be packed in a pallet to avoid any damage.
B: Not more than 35kg per carton box, about 1000kg per pallet
5. How long to make a sample? Is it free?
A: 7 days depending on the sample's complexity. Normally, our sample is free
6. How to contact us?
A: Send your inquiry details in the below, Click "send" now!
1. Thousands of products in stock and ready to ship.
2. The most competitive pricing
3. Free shipment container loading
4. Putting the customer's needs first, always
5. On call,24 hours a day,7 days a week