Product Description
Tension Clamps are live line tools compatible for distribution tap connections.Bronze Alloy and Aluminum Alloy castings offer high strength, corrosion resistance, and conductor compatibility.
Extended jaw width means excellent conductor contact, reduced joint temperature, minimal conductor cold flow and reduced twisting of the conductor during installation.Spring loaded feature compensates for cold flow and offsets tightening torque vibrations.Forged eye bolts provide corrosion free strength and uniformed expansion under loading.The side positioned tap connection prevents possible corrosion of conductor or clamp on bimetal connections.Successful Current Cycle testing per ANSI C119.4 provides assurances that the MPS hot line clamp will withstand the ampacity of a properly installed connection.
Application:
(1)For dead ending ofACSR,AAAC,and AAC conductor.
(2)lt accepts wide range ofconductor sizes16-95mm2.
Material:
Body: Aluminum Alloy.
'U' Band: Galvanized Steel.
Product Parameters
About us
FAQ
1. How to buy your ideal products?
A: You can provide us your drawings, and we will produce it as per your drawings. Or we can design it if you do not have a clear plan.
2. How to pay?
A: TT and L/C are acceptable and TT will be more appreciated.30% deposit before producing, 70% balance before loading by TT.
3. What is the delivery time?
A: It depends on order quantity.Generally, the delivery time will be within 15 to 30 days.
4. Package information
A:For inner box and master carton are made as per international standards,and we can make special designed for you if need.And if necessary,will be packed in pallet to avoid any damage.
B:Not more than 35kg per carton box,about 1000kg per pallet
5.How long to make a sample?Is it free?
A:7 days depending on the sample's complexity.Normally,our sample is free
6.How to contact us?
A:Send your inquiry details in the below,Click "send" now!
Our Service
Service
1.Thousands of products in stock and ready to ship.
2.The most competitive pricing
3.Free shipment container loading
4.Putting the customer's nees first,always
5.On call,24 hours a day,7 days a week